top of page

Box Park, Croydon

The project involved the fabrication and installation of 171 tonnes of hot rolled steelwork to create a pop-up shipping container mall housing a mix of fashion and lifestyle brands, galleries, cafes and restaurants.

Our contract also involved the off loading and installation of 97 No. modified shipping containers which form part of the retail outlets.

We also had to design and fabricate a container lifting frame specifically for the project.

The mall opened October 2016.

Client:  Box Park Ltd.
Main Contractor:  Randall Contracting Ltd.
 
Engineer:  BDP
 
Architect:  BDP
 
Steel Tonnage:  171 tonnes

STRUCTURES LTD

Registered in England No. 03023309

BCSA RQSC Buildings Contractor logo.jpg
SCCS Logo_edited_edited_edited.png

ISO 3834-3

ISO 19650-2

constructionline GOLD 1.JPG
UKCA black fill.png
IStructE_tracklogo_RGB.jpg
bottom of page