Greenwich Square, London
FEATURE
Client: Hadley Mace
Main Contractor: Mace
Engineer: MeinHardt
Architect: Make Architects
Steel Tonnage: 250 tonnes
Measuring 55m long, the Wave is multi functional as it is an entrance canopy, roof structure and an internal wall to the Greenwich Centre’s atrium.
This project was a feature article on www.newsteelconstruction.com